Navigate to...

December

December 2014

We Believe There is a Better Way…

10 Dec 2014
Change is in the air at AE Smith, as a new CEO brings fresh energy, takes stock of AE Smith’s past achievements, builds on our strengths and looks for new and better ways to help our customers

Read more

CSIRO Gets New Chiller in Record Time

3 Dec 2014
When constant temperature is vital and a fast turnaround between old and new equipment is of the essence, AE Smith won’t disappoint

Read more

Good Things Come in Small Prefabricated Packages

1 Dec 2014
Hot on the back of delivering a 16 metre, 10 tonne giant prefabricated module at Monash University’s Green Chemical Futures building, AE Smith has again proved “there is a better way” this time manufacturing 8 significantly smaller “prefab modules” as part of an onsite power, turnkey cogeneration solution AE Smith is delivering at 567 Collins Street for Leighton Contractors

Read more