Navigate to...

Onsite Power

AE Smith delivers turnkey cogeneration, trigeneration and standby power solutions throughout Australia

We work collaboratively with clients, consultants, developers, builders and main contractors to design and install market leading systems that meet your energy plant requirements as well as Green Star and NABERS sustainability objectives.

In every aspect from design, fine-tuning to ongoing maintenance, we have ensured we can deliver a turnkey solution that works. Every AE Smith on-site energy plant project is resourced with an integrated mechanical and electrical team of experts.

We have developed SEAM (System Energy Analysis & Monitoring), AE Smith’s proprietary energy control and reporting system, and we have detailed service processes following installation to ensure maximum operational efficiency.

AE Smith has the in-house mechanical and electrical engineering expertise, operating as one integrated team to deliver an onsite energy plant solution

Traditionally, electrical and mechanical disciplines have been sourced from different contractors. Through the integration of resources with the required expertise, we ensure seamless and detailed design procedures, through to final commissioning and maintenance.

With a multidisciplinary Project Manager overseeing each project team, challenges are resolved faster and communication is accelerated, ensuring the energy project remains on schedule.

Case Study: Sydney Town Hall Trigeneration

AE Smith has provided design, construct, operate and maintain services for Sydney Town Hall’s gas-fired, Microturbine trigeneration power system — the first trigeneration system in New South Wales to feed into the power grid. The low-carbon form of energy production now supplies power, heating and cooling to the iconic, heritage-listed Sydney Town Hall, and neighbouring Town Hall House, where 15,000 City of Sydney employees work. The 1,400 kilowatt system is expected to cut carbon emissions by more than 40,000 tonnes over its 30-year lifetime.

 

 

At the 2015 Queensland State Architecture Awards, the Lady Cilento Children’s Hospital (LCCH), was announced …

Recently, AE Smith’s significant construction project at the Green Chemical Futures building at Monash University, …

The [1.4 Megawatt electrical trigeneration system comprised of seven 200kW Capstone Microturbines] will be located …

The world-first solution... It is significantly larger than a standard diluter, square instead of round, …

AE Smith offers the distinct advantage of having an integrated, in-house engineering team. All services …

At AE Smith, we believe there is a better way: A better way to work …

Yes; [AE Smith] can install, commission and maintain Capstone microturbines anywhere in Australia. But we …

The world-class central energy plant, constructed and commissioned by AE Smith, will occupy 4,500 square …

AE Smith integrated mechanical and electrical team collaboratively delivered the detailed design, sourcing, installation and …

The new Queensland Children’s Hospital in South Brisbane represents the largest capital investment in children’s …

There’s obviously the technical expertise AE Smith possess. But very few companies have the resources …